Skip to product information

1998-2001 Dodge Ram 2500 4wd 46RH-RE Transmission Coooler Lines Stainless Steel 2pc

1998-2001 Dodge Ram 2500 4wd 46RH-RE Transmission Coooler Lines Stainless Steel 2pc
This transmission cooler line kit includes the required lines for routing transmission fluid between the transmission and radiator. The assemblies feature pre-formed stainless steel tubing with a rubber hose section on one end, complete with fittings, to match original equipment connection requirements. The lines are formed to follow factory-style routing for proper clearance and reliable fluid flow. Each stainless steel tube is manufactured on state-of-the-art CNC bending equipment to provide enhanced corrosion resistance, precise fitment, and long-term durability. All fittings are integral to the hose and tube assemblies and installed as part of the completed lines.
Fulfillment   This item is made to order and cannot be returned or exchanged.
Lead Time   Please allow 1-2 weeks for processing prior to shipment.
Material   Stainless Steel
California Proposition 65  WARNING: This product may expose you to chemicals which are known to the state of California to cause cancer, birth defects, or other reproductive harm. For more information visit https://www.p65warnings.ca.gov/

1998-2001 Dodge Ram 2500 4wd 46RH-RE Transmission Coooler Lines Stainless Steel 2pc

  • SDTT9801
  • Please allow 1-2 weeks for processing prior to shipment.
    Ext Handling Time
$119.00
This transmission cooler line kit includes the required lines for routing transmission fluid between the transmission and radiator. The assemblies feature pre-formed stainless steel tubing with a rubber hose section on one end, complete with fittings, to match original equipment connection requirements. The lines are formed to follow factory-style routing for proper clearance and reliable fluid flow. Each stainless steel tube is manufactured on state-of-the-art CNC bending equipment to provide enhanced corrosion resistance, precise fitment, and long-term durability. All fittings are integral to the hose and tube assemblies and installed as part of the completed lines.
Fulfillment   This item is made to order and cannot be returned or exchanged.
Lead Time   Please allow 1-2 weeks for processing prior to shipment.
Material   Stainless Steel
California Proposition 65  WARNING: This product may expose you to chemicals which are known to the state of California to cause cancer, birth defects, or other reproductive harm. For more information visit https://www.p65warnings.ca.gov/

Reviews